Showing posts with label CHALCO. Show all posts
Showing posts with label CHALCO. Show all posts

Wednesday, February 15, 2012

News: Abu Dhabi smelter joins crowded space for Sarawak’s energy


Abu Dhabi smelter joins crowded space for Sarawak’s energy



June 18, 2011

Najib walks beside Abu Dhabi’s Crown Prince Sheikh Mohammed bin Zayed Al Nahyan (right) during an official welcoming ceremony in Putrajaya, June 17, 2011. — Reuters pic
KUALA LUMPUR, June 18 — Oil-rich Abu Dhabi’s RM18.1 billion joint-venture to develop aluminium-related industries in Sarawak is causing concern as it will crowd two other proposed smelters and an existing plant for the use of cheap power from the state’s Bakun Dam.
The Malaysian Insider understands from state officials that the 2,400MW hydroelectric dam can only support two large smelters and, possibly, a smaller one, leaving them to figure out if one of the big investors could pull out from the state.
“Smelting is not a small business. It needs up to 1,000MW for each smelter so Bakun’s 2,400MW is not enough for all,” a state official told The Malaysian Insider on condition of anonymity.
Prime Minister Datuk Seri Najib Razak announced yesterday that the National Economic Council had approved the joint venture by 1 Malaysia Development Berhad (1MDB) and Abu Dhabi’s Mubadala Development Company (Mubadala) to develop a RM12.7billion technologically advanced energy-efficient aluminium smelter.
“Mubadala will also help 1MDB team up with other strategic partners with expertise to develop downstream industries valued at RM5.4 billion,” he told a press conference yesterday.
The investment is expected to create more than 40,000 skilled jobs.

Bakun will not be able to cater to all four smelting plants. — Picture by Mohamad Shoox
Two other large smelters — one by a joint-venture between Cahya Mata Sarawak (CMS) and Rio Tinto Alcan, and another by GIIG Holdings Sdn Bhd and the Aluminium Corp of China Ltd (Chalco) — are still in the early stages of development. Both are looking at establishing smelters with capacities of 720,000 tonnes and 330,000 tonnes, respectively.
The only running smelter at the moment is Press Metal Bhd’s 60,000-tonne plant in Mukah, which has been operational since November 2009. It uses about 10 MW of power that is supplied by Sarawak Energy Bhd.
Sarawak has also announced it will develop other hydro power dams in the future but these dams will not be ready if all the smelting plants take off.
The Sarawak government has exclusive rights to Bakun’s power at a rate of 6.25 sen/kWh, under a deal signed between the state-owned Sarawak Electric Supply Corporation, a subsidiary of Sarawak’s sole electricity provider Sarawak Energy Bhd (SEB), and Sarawak Hidro Sdn Bhd, a unit of the Ministry of Finance Incorporated and owner of the Bakun Dam.
“It looks like one giant smelter might not take off. It could be Rio Tinto’s as they have yet to secure a power purchase agreement,” another source told The Malaysian Insider.
The source also noted environmentalists’ fear of pollution from the number of smelters in the state, known for its vast areas of million-years old rainforest and a fragile eco-system that is home to rare species of flora and fauna.
“Smelting is not a clean industry. There is that concern about pollution that the state must handle,” the source said, adding Sarawak is already facing pressure for its logging industry.
The Miri-based Borneo Research Institute Malaysia (Brimas), a NGO dedicated to protecting the environment and the rights of indigenous peoples, previously expressed health fears from the smelting industry when Rio Tinto first announced its plans for a smelter.
The principal sources of pollution caused by smelting are contaminant-laden air emissions and process waste such as wastewater and slag but newer technologies are available to reduce them.

Source: http://www.themalaysianinsider.com/malaysia/article/abu-dhabi-smelter-joins-crowded-space-for-sarawaks-energy/

News: Loji Press Metal di Bintulu beroperasi Sept


Loji Press Metal di Bintulu beroperasi Sept


by Reno Benjamin. Posted on January 14, 2012, Saturday

LAWAT: Kakitangan AZAM bersama wakil media tempatan merakamkan kenangan di Press Metal Sarawak Sdn Bhd, Mukah kelmarin. Turut kelihatan ialah Koon (sembilan kiri) serta Aloysius (sepuluh kiri).
Berkos RM3b, loji kedua selepas Mukah berupaya hasil 320,000 tan metrik aluminium
MUKAH: Loji peleburan aluminium Press Metal Berhad (PMB) di Samalaju, Bintulu yang dibina dengan kos lebih kurang RM3 bilion dijadual mula beroperasi pada September tahun ini.

Pengarah Eksekutif PMB, Koon Poh Ming berkata, loji tersebut adalah yang kedua milik PMB di negara ini selepas loji Press Metal Sarawak Sdn Bhd (PMSSB) di Mukah, yang telah beroperasi sejak bulan Ogos 2009.

“Setelah beroperasi nanti, loji ini berupaya mengeluarkan 320,000 tan metrik aluminium,” ujarnya kepada pemberita yang mengadakan lawatan ke loji PMSSB, petang kelmarin.

Lawatan itu yang dianjurkan oleh Angkatan Zaman Mansang (AZAM) dan Lembaga Pembangunan Koridor Wilayah (RECODA) bertujuan memberi gambaran lebih jelas berhubung apa yang berlaku dalam Koridor Tenaga Diperbaharui Sarawak (SCORE).

Dalam lawatan itu yang diketuai oleh Ketua Pegawai Eksekutif AZAM, Datu Aloysius Dris dan Ketua Pegawai Pelaburan RECODA, Kamil Daniel Yap, rombongan turut diberi taklimat berhubung operasi PMB dan PMSSB oleh Pengurus Pembangunan dan Teknikal PMSSB, Siew Eng Fui.

PMB ditubuhkan pada tahun 1986 serta beribu pejabat di Kuala Lumpur, beroperasi di beberapa buah negara seperti United Kingdom, Australia, China, Kanada, Hong Kong, Singapura dan Dubai.

Ditanya berhubung perancangan syarikat bagi memperluaskan operasinya di Mukah, Koon berkata syarikat buat masa ini tidak mempunyai perancangan tersebut.

Ini kerana, katanya, apabila syarikat memperluaskan operasi di Mukah, keperluan terhadap tenaga elektrik juga akan bertambah dan ini memerlukan penyambungan talian kabel yang baharu.

“Oleh itu kita mengambil keputusan untuk membina loji baharu di Samalaju, Bintulu bagi meningkatkan pengeluaran syarikat,” jelas Koon.

Loji PMSSB yang dibina dengan kos kira-kira RM1 bilion di kawasan seluas 1,000 ekar, berupaya mengeluarkan 120,000 tan metrik aluminium.

Syarikat mengeluarkan aluminium dalam bentuk jongkong (ingot) dan batang aluminium (billets), dengan lebih separuh pengeluaran dieksport ke negara luar seperti Jepun, Korea, Indonesia, Vietnam dan sebagainya.

Loji PMSSB di Mukah ini menggunakan teknologi yang disediakan oleh Aluminium Corporation of China Limited (CHALCO).

Source: http://www.theborneopost.com/2012/01/14/loji-press-metal-di-bintulu-beroperasi-sept/